Task tracker

Verified against Kanvaz v9.7.0.

A simple checklist attached to your .kanvaz file, for the “remember to actually gather these 6 references” layer of work that doesn’t belong as its own card. Open it from the side panel’s Tasks icon (see Side Panel).

Shape

The Task Tracker section of the side panel, with tasks, subtasks, progress and a completion toast
The Task Tracker beside a board: tasks, subtasks and a completion toast.
  • One flat list, file-level: not tied to any single board within a multi-board file
  • Each task has text, a done/not-done state, up to 5 subtasks, and an optional link to one card
  • A task with subtasks can only be marked done once every subtask is done, a task with no subtasks toggles done directly
  • A card-linked task jumps to and zooms into that card’s board when clicked

Working with tasks

Action How
Add a task Type in the “Add a task…” field, press Enter or click +
Toggle done Click the checkbox
Add a subtask Up to 5 per task
Link to a card Ties the task to a specific reference on the board
Delete Both tasks and subtasks are individually deletable

What it’s not

There’s no undo/redo for Task Tracker changes in this version, same deliberate scope decision already made for Scratch Board strokes. It’s also not exposed as its own board-switchable “view”, it’s a flat, file-wide list by design, not per-board.

  • Side Panel: where the Tasks panel lives
  • MCP Bridge: an AI assistant can list/add tasks and toggle subtasks directly (listTasks, addTask, toggleSubtask)
Did this guide help?Kanvaz is free, offline and built by one person. A star tells other artists it is worth trying.